Port statistics

The Port of Stuttgart was built in two stages - from 1954 -1958 and from 1966 - 1968. Total investment in the construction of the docks, rail facilities, bridges and access roads, including initial planning and site construction, amounted to some 80 million German marks.

Port territory:Total area:99 hectares
Port basins:No.:3
 Area of water (including federal waterways)30,7 hectares
 Length of quayside providing loading/unloading facilities4,9 km
Port rail facilities:Length of core and perimeter port rail network:37,0 km
Transportation complex:Container handling trimodal:1
 Containerhandling rail/road:2
Bridges and access roads:Total length:7,5 km
 Otto-Konz bridges across basin 1:130 m
 across basin 2:105 m
 Otto-Hirsch bridges across basin 1:140 m
Port development site / operational area:Total area:64,6 hectares
 Open storage area:149 000 m²
 Covered storage area:210 000 m²
 Silo capacity:82 000 t
 Tank capacity:55 000 m³
 Drying facilities:5 000 m²
Dockside loading - unloading facilitiesCranes and loading bridges:37
 Oil transfer facilities:1
 Heavy freight quay 80 m long with a load capacity of up to150 t/m2